Latest News

Ikom Bridge: Cross River Government Expresses Satisfaction

Advertisements

Cross River Commissioner for Works, Hon Dane Osim Asu has mentioned that the administration of Sen Prof. Ben Ayade is severely committeed towards making certain that top high quality work is finished on the ongoing modernization and substitute of the Ikom Bridge by the Federal Government personal contractor, SETRACO.

Cross River State logo crs logo cross river Logo

Hon. Osim Asu, who disclosed this whereas inspecting the continued progress and high quality of labor being undertaken by SETRACO, on the Ikom Bridge, on Monday, additionally expressed satisfaction on the high quality and tempo of labor carried out up to now in phrases.of bulldozing and grading.

Advertisements

Saudi Arabia Executes Nigerian Woman And 3 Others

He said that the aim of the visit is to hold out on the spot evaluation of the state of the continued development and modernization work on the Ikom Bridge as a part of the primary coverage thrust of Governor Ayade for high quality management and normal in all Cross River authorities initiatives, in addition to these of the federal authorities which have direct bearing on the Government and folks of the state.

The Cross River State Commissioner for Works defined that he’s happy that the contractor has been totally mobilized with tools totally on floor as excavation and concrete work s have been accomplished.

He disclosed that the water belt and the amount of water in the meanwhile is low, as a result of it required deck on Pier, and that out of the 9 expired Piers, 5 have been constructed and concrete work accomplished.

Military uncovers illegal gun factory in Benue

Hon. Osim Asu equally disclosed that the span of the bridge is 11.5 metres whereas the size is 360 metres with reenforced concrete deck slaps, pre-stress concrete bims, every 36 metres lengthy over 10 span bridge, having eight metres carriage method and 1.5 metre walkway.

The Project Manager and Federal Controller of works, Cross River State, Engineer Bassey Nsetie, on his half disclosed to the Commissioner for Works that the mission can be accomplished and delivered in 24 months interval.

Advertisements
1. Register Your Business or Company Name with ease. Call Akahi G. International - 08038644328
2. Host your Apps, Quickbooks on CLOUD SERVER - Call McSea Rep - 08066519411
Advertisements

Categories: Latest News

Leave a Reply

Your email address will not be published.